Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Problem Solving with OEE – Measuring Success

OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation.  However, like many metrics, it can become the focus rather than the gage of performance it is intended to

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question

Posted in Advanced Lean Manufacturing, Availability, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Reduce Costs with OEE: Cost Control

OEE can be used to improved your bottom line. We provide a little insight to getting it right.

Posted in Advanced Lean Manufacturing, Availability, Cost Control, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE and Standardized Work

Overall Equipment Efficiency (OEE):  Standardized Work After you start collecting OEE data for your processes, you may notice significant variance between departments, shifts, and even employees performing the work.  Of the many aspects that you will be inclined to investigate,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

LEAN Environment: Waste Management and OEE

In recent years much emphasis has been placed on the state of our environment and LEAN can help our cause.  If we consider just how much energy and resources are consumed due to inefficiency and waste.  OEE is a measure of

Posted in APQP, Cost Control, Eliminate Waste, Environment, Lean, Problem Solving, Process Control and OEE, Quality, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Weighted OEE: How To Calculate Total Plant OEE

In this post we will present a simple method to calculate a truly weighted OEE, including weighted factors Availability, Performance, and Quality. The QUICK weighted OEE method: Recalling our original definition of OEE, we are measuring how effectively our planned

Posted in Advanced Lean Manufacturing, Availability, Capacity, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Quality Factor, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Calculate OEE – The Real OEE Formula with Examples

A lot of time and effort can be wasted collecting data and analyzing the results.  Fortunately, Overall Equipment Effectiveness, or OEE, is one of those metrics that is easily calculated and can be applied to any process, department, or the entire organization.

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2008
S M T W T F S
« Nov   Jan »
 123456
78910111213
14151617181920
21222324252627
28293031  

Categories

Archives

Twitter

error: Content is protected !!