OEE in an imperfect world

Background: This is a more general presentation of “Variation:  OEE’s Silent Partner” published on January 31, 2011. In a perfect world we can produce quality parts at rate, on time, every time.  In reality, however, all aspects of our processes

Posted in Advanced Lean Manufacturing, Availability, Performance, Problem Solving, Process Control and OEE, Quality Tagged with: , , , , , , , , ,

OEE: The Means to an End – Differentiation Where It Matters Most

Does your organization focus on results or the means to achieve them?  Do you know when you’re having a good day?  Are your processes improving? The reality is that too many opportunities are missed by simply focusing on results alone.

Posted in Advanced Lean Manufacturing, Availability, Contingency Planning, Eliminate Waste, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , ,

OEE: Planned Downtime and Availability

As a core metric, Overall Equipment Effectiveness or OEE has been adopted by many companies to improve operations and optimize the capacity of existing equipment.  Having completed several on site assessments over the past few months we have learned that

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Execution Tagged with: , , , , , , , ,

Flawless Execution – “This Is It” – Practice Makes Perfect

We are often encouraged to look beyond our own business models to expand our horizons or to simply gain a different perspective.  Music is one of my personal areas of interest in the outside world and I have learned to

Posted in Advanced Lean Manufacturing, Availability, Collaboration, Eliminate Waste, Performance, Standardized Work, Training Tagged with: , , , , , , , , , ,

Contingency Planning For Lean Operations (II)

Contingency Planning For Lean Operations – Part II Putting together a contingency plan can be quite challenging when you consider all the things that could go wrong at any given point in time.  Contingency plans should not only be restricted to “things

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, Lean, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

June 2017
S M T W T F S
« Sep    
 123
45678910
11121314151617
18192021222324
252627282930  

Categories

Archives

Twitter

error: Content is protected !!