OEE Integration – Part IV

OEE and APQP – New Equipment / Program / Process Launch In parts I – III we discussed the role of leadership to define policies and procedures.  We also discussed developing the infrastructure of your team through training and development.  However, this

Posted in Advanced Lean Manufacturing, APQP, Capacity, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , ,

OEE and Capacity Management

Capacity – Available or Required? From a scheduling perspective it is very easy to determine how much capacity (or time) will be required to manufacture a minimum quantity of parts.  However, it is not just a matter of multiplying the Standard Cycle

Posted in Advanced Lean Manufacturing, Capacity, Lean Metrics, OEE: Overall Equipment Efficiency Tagged with: , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE and Standardized Work

Overall Equipment Efficiency (OEE):  Standardized Work After you start collecting OEE data for your processes, you may notice significant variance between departments, shifts, and even employees performing the work.  Of the many aspects that you will be inclined to investigate,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Weighted OEE: How To Calculate Total Plant OEE

In this post we will present a simple method to calculate a truly weighted OEE, including weighted factors Availability, Performance, and Quality. The QUICK weighted OEE method: Recalling our original definition of OEE, we are measuring how effectively our planned

Posted in Advanced Lean Manufacturing, Availability, Capacity, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Quality Factor, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Calculate OEE – The Real OEE Formula with Examples

A lot of time and effort can be wasted collecting data and analyzing the results.  Fortunately, Overall Equipment Effectiveness, or OEE, is one of those metrics that is easily calculated and can be applied to any process, department, or the entire organization.

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

June 2017
S M T W T F S
« Sep    
 123
45678910
11121314151617
18192021222324
252627282930  

Categories

Archives

Twitter

error: Content is protected !!