Lean Execution > Eliminate Waste
Blog Archives

Using TRIZ for Problem Solving – Resources

In our first post on this topic, “Using Triz for Problem Solving – Introduction“, we provided a very basic introduction to TRIZ.  In the spirit of TRIZ, it is not our intent to rewrite or redefine the TRIZ process when excellent

Posted in Advanced Lean Manufacturing, APQP, Contingency Planning, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, Problem Solving, Risk Management, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Contingency Plans – Crisis Management in Lean Organizations

Contingency Planning For Lean Organizations – Part IV – Crisis Management In a previous post we eluded that lean organizations are likely to be more susceptible to disruptions or adverse conditions and may even have a greater impact on the business.  To some

Posted in Advanced Lean Manufacturing, APQP, Contingency Planning, Customer Service, Eliminate Waste, Lean, Problem Solving, Quality, Risk Management, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , ,

Lean is Eco-Friendly – Coke Shows How

Today’s front page of the Toronto Star (Monday 22-Nov-09) featured an article on Coke’s new Eco-Bottle. The revolutionary plastic made from sugar cane byproducts is not biodegradable but can be 100% recycled. Are companies beginning to understand how their product or service

Posted in Advanced Lean Manufacturing, Customer Service, Eliminate Waste, Lean, Lean Metrics, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , ,

Contingency Planning For Lean Operations (II)

Contingency Planning For Lean Operations – Part II Putting together a contingency plan can be quite challenging when you consider all the things that could go wrong at any given point in time.  Contingency plans should not only be restricted to “things

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, Lean, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Office with Excel and VBA

Have you ever wondered what people do at their computers all day?  How can they possibly be that busy working on their day to day tasks?  The answer may surprise you!  Computers were supposed to make our jobs easier and

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean, Lean Metrics, Performance, Training Tagged with: , , , , , , , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

August 2017
S M T W T F S
« Sep    
 12345
6789101112
13141516171819
20212223242526
2728293031  

Categories

Archives

error: Content is protected !!