Using TRIZ for Problem Solving – Resources

In our first post on this topic, “Using Triz for Problem Solving – Introduction“, we provided a very basic introduction to TRIZ.  In the spirit of TRIZ, it is not our intent to rewrite or redefine the TRIZ process when excellent

Posted in Advanced Lean Manufacturing, APQP, Contingency Planning, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, Problem Solving, Risk Management, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Problem Solving with OEE – Measuring Success

OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation.  However, like many metrics, it can become the focus rather than the gage of performance it is intended to

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question

Posted in Advanced Lean Manufacturing, Availability, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Reduce Costs with OEE: Cost Control

OEE can be used to improved your bottom line. We provide a little insight to getting it right.

Posted in Advanced Lean Manufacturing, Availability, Cost Control, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

June 2017
S M T W T F S
« Sep    
 123
45678910
11121314151617
18192021222324
252627282930  

Categories

Archives

Twitter

error: Content is protected !!