Lean Execution > Performance
Blog Archives

Communication Breakdown – The Language of Lean

Getting people engaged and “on the same page” requires everyone to understand the language used to convey the message.  Even the method of disseminating information can create confusion.  Oral presentations can convey a completely different message than one delivered in writing. The tone

Posted in Advanced Lean Manufacturing, Execution, Lean, Lean Metrics, Performance, Terminology, Training Tagged with: , , , , , , , ,

Lean Execution: Competing with Giants – It’s all about Speed

Sometimes you need a break from reading and learn from others who are truly walking the talk.  We trust you will find this video, “Competing with Giants – It’s all about Speed”, featuring Dominic Orr, CEO of Aruba Networks, as interesting and thought provoking

Posted in Advanced Lean Manufacturing, Execution, Lean, Performance, Problem Solving, Training Tagged with: , , , , , , , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Time Studies with your BlackBerry

Performing a time study is relatively easy compared to only few years ago.  The technologies available today allow studies to be conducted quite readily. Time Studies and OEE (Overall Equipment Effectiveness) The Performance factor for OEE is based on the Ideal Cycle Time of the

Posted in Advanced Lean Manufacturing, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , ,

Lean Office with Excel and VBA

Have you ever wondered what people do at their computers all day?  How can they possibly be that busy working on their day to day tasks?  The answer may surprise you!  Computers were supposed to make our jobs easier and

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean, Lean Metrics, Performance, Training Tagged with: , , , , , , , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Instant Turnaround for Overall Equipment Effectiveness (OEE)

Instant Turnaround Did you know that your leadership style may be affecting your Overall Equipment Effectiveness?  A highly engaged and motivated workforce is the one single distinguishing trait of the top companies in industry today.  Most leaders and managers alike recognize that having the right people

Posted in OEE: Overall Equipment Efficiency, Performance Tagged with: , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

November 2017
S M T W T F S
« Sep    
 1234
567891011
12131415161718
19202122232425
2627282930  

Categories

Archives

Twitter

error: Content is protected !!