How to Improve OEE – Any Questions?

Ask any Quality or Engineering manager and they will tell you that measurement systems are valuable tools to identify problems and opportunities.  The measurement system itself is not the answer – it is the data source, the EVIDENCE that drives the questions.  It is a

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis Tagged with: , , , , , , , , , , , ,

OEE Integration – Part VI

In the automotive industry, an effective quality system forms the basis of many standard operating procedures used in the manufacturing environment. Specifically, the major automotive OEM’s require that suppliers implement an effective quality system that conforms to the TS16949 Technical

Posted in Advanced Lean Manufacturing, APQP, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , ,

OEE Integration – Part V

Defining overall equipment effectiveness (OEE) criteria as part of the scope of work or purchase order agreement is quickly becoming standard practice throughout the automotive industry and manufacturing in general. OEE Assessments OEE criteria should be performed for every new purchase.  Often

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , ,

Improving OEE: A Hands On Approach

We have explored Overall Equipment Efficiency (OEE) from several perspectives and how it can be used as an effective performance metric.  The purpose of measuring and monitoring OEE, at a minimum, should be three fold: To ensure the current performance levels are sustained,

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, Lean Metrics, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , ,

OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes Definition:  Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single

Posted in Availability, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Problem Solving with OEE – Measuring Success

OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation.  However, like many metrics, it can become the focus rather than the gage of performance it is intended to

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question

Posted in Advanced Lean Manufacturing, Availability, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Reduce Costs with OEE: Cost Control

OEE can be used to improved your bottom line. We provide a little insight to getting it right.

Posted in Advanced Lean Manufacturing, Availability, Cost Control, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

June 2017
S M T W T F S
« Sep    
 123
45678910
11121314151617
18192021222324
252627282930  

Categories

Archives

Twitter

error: Content is protected !!