Lean: Beyond Reach!

Almost everything I read or learned suggests that lean was never intended to be complicated. The simplest definition of lean I have read to date follows: Focus on what matters and eliminate what doesn’t This is not to suggest that

Posted in Advanced Lean Manufacturing, Terminology, Training Tagged with: , , , , , , ,

Communication Breakdown – The Language of Lean

Getting people engaged and “on the same page” requires everyone to understand the language used to convey the message.  Even the method of disseminating information can create confusion.  Oral presentations can convey a completely different message than one delivered in writing. The tone

Posted in Advanced Lean Manufacturing, Execution, Lean, Lean Metrics, Performance, Terminology, Training Tagged with: , , , , , , , ,

Contingency Planning For Lean Operations – Part III

Contingency Planning for Lean Operations – Part III   “Deaths spark huge crib recall” was the main headline of today’s Toronto Star (24-Nov-09).  This recall was the result of 4 infant deaths and affects up to 2.1 million units sold.  Click here

Posted in Advanced Lean Manufacturing, APQP, Cost Control, Customer Service, Problem Solving, Process Control and OEE, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,

OEE and Overtime

A number of requests have been received recently that point to a lack of clarity in the definition of Overall Equipment Effectiveness (OEE).  One of the questions we were recently asked is: How do you calculate OEE for Overtime hours?

Posted in OEE: Overall Equipment Efficiency, Process Control and OEE, Terminology Tagged with: , , , , , , ,

Weighted OEE: How To Calculate Total Plant OEE

In this post we will present a simple method to calculate a truly weighted OEE, including weighted factors Availability, Performance, and Quality. The QUICK weighted OEE method: Recalling our original definition of OEE, we are measuring how effectively our planned

Posted in Advanced Lean Manufacturing, Availability, Capacity, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Quality Factor, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2017
S M T W T F S
« Sep    
1234567
891011121314
15161718192021
22232425262728
293031  

Categories

Archives

Twitter

error: Content is protected !!