OEE: Planned Downtime and Availability

As a core metric, Overall Equipment Effectiveness or OEE has been adopted by many companies to improve operations and optimize the capacity of existing equipment.  Having completed several on site assessments over the past few months we have learned that

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Execution Tagged with: , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How OEE can improve your Inventory

Once you have established a robust OEE system, you should also be reaping benefits in other areas of your organization. We will be offering some insights into the other performance metrics such as inventory over the next few weeks. Improved

Posted in Advanced Lean Manufacturing Tagged with: , , , , , , , , , , ,

OEE Integration: Can you fix it?

As we are all aware, inspecting or measuring parts does not change the quality of the product.   Likewise, measuring and reporting OEE alone does not solve problems or improve performance.  While it is fair to say that increased focus and measurement

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

OEE Integration – Where do We Measure OEE? – Part I

OEE Integration Part IX – Where do we measure OEE? Our recent posts have included numerous examples to calculate OEE correctly. We also discussed integration of OEE as an effective metric for managing your processes and ultimately how to analyze

Posted in Advanced Lean Manufacturing, Availability, Contingency Planning, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Process Control and OEE, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Take the Hit

The simplicity of measuring and calculating OEE is compounded by the factors that ultimately influence the end result.  Because the concept of OEE can be readily embraced by most employees, it is easy for many people to get involved in the

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , , ,

OEE and Capacity Management

Capacity – Available or Required? From a scheduling perspective it is very easy to determine how much capacity (or time) will be required to manufacture a minimum quantity of parts.  However, it is not just a matter of multiplying the Standard Cycle

Posted in Advanced Lean Manufacturing, Capacity, Lean Metrics, OEE: Overall Equipment Efficiency Tagged with: , , , , , , , , , , , , ,

Improving OEE: A Hands On Approach

We have explored Overall Equipment Efficiency (OEE) from several perspectives and how it can be used as an effective performance metric.  The purpose of measuring and monitoring OEE, at a minimum, should be three fold: To ensure the current performance levels are sustained,

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, Lean Metrics, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , ,

OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes Definition:  Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single

Posted in Availability, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930
31  

Categories

Archives

Twitter

error: Content is protected !!