Lean Execution > Consulting
Blog Archives

Integrated Waste: Lather, Rinse, Repeat

Admittedly, it has been a while since I checked a shampoo bottle for directions, however, I do recall a time in my life reading:  Lather, Rinse, Repeat.  Curiously, they don’t say when or how many times the process needs to be repeated. Perhaps

Posted in Advanced Lean Manufacturing, Execution, Lean, Problem Solving Tagged with: , , , , , , , , ,

OEE: Planned Downtime and Availability

As a core metric, Overall Equipment Effectiveness or OEE has been adopted by many companies to improve operations and optimize the capacity of existing equipment.  Having completed several on site assessments over the past few months we have learned that

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Execution Tagged with: , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2018
S M T W T F S
« Jul    
 1
2345678
9101112131415
16171819202122
23242526272829
3031  

Categories

Archives

Twitter

error: Content is protected !!