OEE in the Automotive Industry

The automotive industry appears to be rebounding at a faster rate than most (if not all) experts may have anticipated.  Many OEM’s and their suppliers are attempting to boost production to replenish inventories and support renewed demand for their products. 

Posted in OEE: Overall Equipment Efficiency Tagged with: , , , , , , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Improve OEE – Any Questions?

Ask any Quality or Engineering manager and they will tell you that measurement systems are valuable tools to identify problems and opportunities.  The measurement system itself is not the answer – it is the data source, the EVIDENCE that drives the questions.  It is a

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis Tagged with: , , , , , , , , , , , ,

OEE Measurement Error

How many times have you, or someone you know, challenged the measurement process or method used to collect the data because the numbers just “don’t make sense” or “can’t be right”? It is imperative to have integrity in the data

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

September 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930

Categories

Archives

Twitter

error: Content is protected !!