Lean Execution > Integrating OEE
Blog Archives

OEE, Labour, and Inventory

Almost every manufacturing facility has a method or means to measure labour efficiency.  Some of these methods may include Earned versus Actual hours or perhaps they are financially driven metrics such as “Labour as a Percent of Sales” or as “Labour Variance to Plan”.  As

Posted in Advanced Lean Manufacturing, Cost Control, Eliminate Waste, Lean Metrics, Performance Tagged with: , , , ,

OEE: Planned Downtime and Availability

As a core metric, Overall Equipment Effectiveness or OEE has been adopted by many companies to improve operations and optimize the capacity of existing equipment.  Having completed several on site assessments over the past few months we have learned that

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Execution Tagged with: , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,

SPC for OEE

Some of our readers have expressed an interest in the application of Statistical Analysis Tools for OEE.  We have also reviewed various texts and articles that have expressed opposing views on the application of Statistical Tools with OEE data. Our simple answer

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

6 things OEE is NOT!

While OEE has been receiving much deserved attention as manufacturers look for ways to improve their bottom line, it is not the cure for all that ails manufacturing.  Many in the manufacturing community seem to be getting caught up in the

Posted in Advanced Lean Manufacturing, Cost Control, Lean Metrics, Problem Solving, Process Control and OEE Tagged with: , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2017
S M T W T F S
« Sep    
1234567
891011121314
15161718192021
22232425262728
293031  

Categories

Archives

Twitter

error: Content is protected !!