Lean Execution > Labour
Blog Archives

OEE, Labour, and Inventory

Almost every manufacturing facility has a method or means to measure labour efficiency.  Some of these methods may include Earned versus Actual hours or perhaps they are financially driven metrics such as “Labour as a Percent of Sales” or as “Labour Variance to Plan”.  As

Posted in Advanced Lean Manufacturing, Cost Control, Eliminate Waste, Lean Metrics, Performance Tagged with: , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2017
S M T W T F S
« Sep    
1234567
891011121314
15161718192021
22232425262728
293031  

Categories

Archives

Twitter

error: Content is protected !!