How to Calculate the Quality Factor for OEE

How to correctly calculate the Quality Factor for OEE Most people assume that the quality factor for Overall Equipment Effectiveness (OEE) is determined by simply calculating the yield of good parts from the total parts produced.  Unfortunately, this logic does

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, Quality, Quality Factor Tagged with: , , , , , , , , , , , , , , , , , ,

OEE and the Quality Factor

Many articles written on OEE (ours being the exception), indicate or suggest that the quality factor for OEE is calculated as a simple percentage of good parts from the total of all parts produced.  While this calculation may work for

Posted in Advanced Lean Manufacturing, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , ,

SPC for OEE

Some of our readers have expressed an interest in the application of Statistical Analysis Tools for OEE.  We have also reviewed various texts and articles that have expressed opposing views on the application of Statistical Tools with OEE data. Our simple answer

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

OEE – A Vantage Point Metric

The automotive industry has recently been plagued by doom and gloom as the economy continues to erode any chances for a rebound.  Chrysler has already met with the reality of an uncertain future and has subsequently filed for bankruptcy.  Unfortunately,

Posted in Advanced Lean Manufacturing, Lean Metrics, Problem Solving, Root Cause Analysis, Trouble Shooting Tagged with: , , , , , , ,

OEE Integration: Can you fix it?

As we are all aware, inspecting or measuring parts does not change the quality of the product.   Likewise, measuring and reporting OEE alone does not solve problems or improve performance.  While it is fair to say that increased focus and measurement

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

OEE Where do we Measure – Part II

We have stated that policies and procedures will have an impact on your OEE implementation strategy.  One reader commented on Part I of this post stating that “OEE should be measured at the ‘design’ bottleneck process / piece of equipment that

Posted in Advanced Lean Manufacturing, APQP, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , ,

OEE Integration – Where do We Measure OEE? – Part I

OEE Integration Part IX – Where do we measure OEE? Our recent posts have included numerous examples to calculate OEE correctly. We also discussed integration of OEE as an effective metric for managing your processes and ultimately how to analyze

Posted in Advanced Lean Manufacturing, Availability, Contingency Planning, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Process Control and OEE, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE Integration – Where do we Start?

Where do we Start? We mentioned in our previous post that OEE may be an initiative that your company chooses not to do. We doubt that too many corporations would support that view entirely, however, it may certainly influence how

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , ,

OEE Integration – Part VI

In the automotive industry, an effective quality system forms the basis of many standard operating procedures used in the manufacturing environment. Specifically, the major automotive OEM’s require that suppliers implement an effective quality system that conforms to the TS16949 Technical

Posted in Advanced Lean Manufacturing, APQP, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , ,

OEE Integration – Part V

Defining overall equipment effectiveness (OEE) criteria as part of the scope of work or purchase order agreement is quickly becoming standard practice throughout the automotive industry and manufacturing in general. OEE Assessments OEE criteria should be performed for every new purchase.  Often

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

September 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930

Categories

Archives

Twitter

error: Content is protected !!