Lean Execution > Lean Operations
Blog Archives

Contingency Planning For Lean Operations – Part III

Contingency Planning for Lean Operations – Part III   “Deaths spark huge crib recall” was the main headline of today’s Toronto Star (24-Nov-09).  This recall was the result of 4 infant deaths and affects up to 2.1 million units sold.  Click here

Posted in Advanced Lean Manufacturing, APQP, Cost Control, Customer Service, Problem Solving, Process Control and OEE, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , ,

Contingency Planning For Lean Operations – Part I

Contingency Planning For Lean Operations – Part I Lean operations are driven by effective planning and efficient execution of core activities to ensure optimal performance is achieved and sustained.  The very nature of lean requires extreme attention to detail through all phases

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, Customer Service, Eliminate Waste, Lean, Lean Metrics, Performance, Problem Solving, Process Control and OEE, Quality, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Problem Solving with OEE – Measuring Success

OEE in Perspective As mentioned in our previous posts, OEE is a terrific metric for measuring and monitoring ongoing performance in your operation.  However, like many metrics, it can become the focus rather than the gage of performance it is intended to

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Root Cause Analysis, Training, Trouble Shooting Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE and Standardized Work

Overall Equipment Efficiency (OEE):  Standardized Work After you start collecting OEE data for your processes, you may notice significant variance between departments, shifts, and even employees performing the work.  Of the many aspects that you will be inclined to investigate,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

August 2017
S M T W T F S
« Sep    
 12345
6789101112
13141516171819
20212223242526
2728293031  

Categories

Archives

Twitter

error: Content is protected !!