Lean Execution > Measure OEE
Blog Archives

OEE Integration – Where do We Measure OEE? – Part I

OEE Integration Part IX – Where do we measure OEE? Our recent posts have included numerous examples to calculate OEE correctly. We also discussed integration of OEE as an effective metric for managing your processes and ultimately how to analyze

Posted in Advanced Lean Manufacturing, Availability, Contingency Planning, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Process Control and OEE, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Weighted OEE: How To Calculate Total Plant OEE

In this post we will present a simple method to calculate a truly weighted OEE, including weighted factors Availability, Performance, and Quality. The QUICK weighted OEE method: Recalling our original definition of OEE, we are measuring how effectively our planned

Posted in Advanced Lean Manufacturing, Availability, Capacity, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Quality Factor, Terminology, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

August 2017
S M T W T F S
« Sep    
 12345
6789101112
13141516171819
20212223242526
2728293031  

Categories

Archives

Twitter

error: Content is protected !!