OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE Integration: Can you fix it?

As we are all aware, inspecting or measuring parts does not change the quality of the product.   Likewise, measuring and reporting OEE alone does not solve problems or improve performance.  While it is fair to say that increased focus and measurement

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

OEE Where do we Measure – Part II

We have stated that policies and procedures will have an impact on your OEE implementation strategy.  One reader commented on Part I of this post stating that “OEE should be measured at the ‘design’ bottleneck process / piece of equipment that

Posted in Advanced Lean Manufacturing, APQP, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , ,

OEE and LEAN

Incorporating and tracking performance using Lean metrics doesn’t make a company Lean any more than tracking weight puts you on a diet.  Measurements are like decisions, nothing changes unless actions are taken. How does this apply to OEE?  How does OEE apply to

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , ,

Improving OEE: A Hands On Approach

We have explored Overall Equipment Efficiency (OEE) from several perspectives and how it can be used as an effective performance metric.  The purpose of measuring and monitoring OEE, at a minimum, should be three fold: To ensure the current performance levels are sustained,

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, Lean Metrics, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Variance, Waste, and OEE

Variance is Waste. Variation and OEE are complementary metrics that need to be considered together.

Posted in Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Root Cause Analysis, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

August 2017
S M T W T F S
« Sep    
 12345
6789101112
13141516171819
20212223242526
2728293031  

Categories

Archives

Twitter

error: Content is protected !!