Lean Execution > OEE Calculations
Blog Archives

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How OEE can improve your Inventory

Once you have established a robust OEE system, you should also be reaping benefits in other areas of your organization. We will be offering some insights into the other performance metrics such as inventory over the next few weeks. Improved

Posted in Advanced Lean Manufacturing Tagged with: , , , , , , , , , , ,

How to Calculate the Quality Factor for OEE

How to correctly calculate the Quality Factor for OEE Most people assume that the quality factor for Overall Equipment Effectiveness (OEE) is determined by simply calculating the yield of good parts from the total parts produced.  Unfortunately, this logic does

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, Quality, Quality Factor Tagged with: , , , , , , , , , , , , , , , , , ,

OEE and the Quality Factor

Many articles written on OEE (ours being the exception), indicate or suggest that the quality factor for OEE is calculated as a simple percentage of good parts from the total of all parts produced.  While this calculation may work for

Posted in Advanced Lean Manufacturing, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , ,

SPC for OEE

Some of our readers have expressed an interest in the application of Statistical Analysis Tools for OEE.  We have also reviewed various texts and articles that have expressed opposing views on the application of Statistical Tools with OEE data. Our simple answer

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,

OEE Calculation Errors

Database Errors We agree that collecting and tracking OEE data is a task best suited for a database, however, all the bells and whistles of an OEE system don’t serve much purpose if the calculations are wrong.  Before you make

Posted in Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930
31  

Categories

Archives

Twitter

error: Content is protected !!