OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes Definition:  Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single

Posted in Availability, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2017
S M T W T F S
« Sep    
1234567
891011121314
15161718192021
22232425262728
293031  

Categories

Archives

Twitter

error: Content is protected !!