Lean Execution > OEE Performance
Blog Archives

Time Studies with your BlackBerry

Performing a time study is relatively easy compared to only few years ago.  The technologies available today allow studies to be conducted quite readily. Time Studies and OEE (Overall Equipment Effectiveness) The Performance factor for OEE is based on the Ideal Cycle Time of the

Posted in Advanced Lean Manufacturing, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE Training – Online

Getting Started Online Training is more rampant now than ever.  If you want to learn about OEE and how to calculate it correctly then we have all the information you need right here.  Simply click on the categories of interest to you and research your

Posted in Lean Metrics, OEE: Overall Equipment Efficiency, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

June 2017
S M T W T F S
« Sep    
 123
45678910
11121314151617
18192021222324
252627282930  

Categories

Archives

Twitter

error: Content is protected !!