Lean Execution > OEE Training Online
Blog Archives

How to Calculate the Quality Factor for OEE

How to correctly calculate the Quality Factor for OEE Most people assume that the quality factor for Overall Equipment Effectiveness (OEE) is determined by simply calculating the yield of good parts from the total parts produced.  Unfortunately, this logic does

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, Quality, Quality Factor Tagged with: , , , , , , , , , , , , , , , , , ,

OEE and Standardized Work

Overall Equipment Efficiency (OEE):  Standardized Work After you start collecting OEE data for your processes, you may notice significant variance between departments, shifts, and even employees performing the work.  Of the many aspects that you will be inclined to investigate,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

November 2017
S M T W T F S
« Sep    
 1234
567891011
12131415161718
19202122232425
2627282930  

Categories

Archives

Twitter

error: Content is protected !!