Using TRIZ for Problem Solving – Introduction

Using TRIZ for Problem Solving – Introduction A famous quote from Albert Einstein, “The problems that exist in the world today cannot be solved by the level of thinking that created them.“, applies to the discussion of problem solving and more so to

Posted in Advanced Lean Manufacturing, APQP, Contingency Planning, Lean, Lean Metrics, Problem Solving, Root Cause Analysis, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE in the Automotive Industry

The automotive industry appears to be rebounding at a faster rate than most (if not all) experts may have anticipated.  Many OEM’s and their suppliers are attempting to boost production to replenish inventories and support renewed demand for their products. 

Posted in OEE: Overall Equipment Efficiency Tagged with: , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How OEE can improve your Inventory

Once you have established a robust OEE system, you should also be reaping benefits in other areas of your organization. We will be offering some insights into the other performance metrics such as inventory over the next few weeks. Improved

Posted in Advanced Lean Manufacturing Tagged with: , , , , , , , , , , ,

How to Calculate the Quality Factor for OEE

How to correctly calculate the Quality Factor for OEE Most people assume that the quality factor for Overall Equipment Effectiveness (OEE) is determined by simply calculating the yield of good parts from the total parts produced.  Unfortunately, this logic does

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, Quality, Quality Factor Tagged with: , , , , , , , , , , , , , , , , , ,

OEE and the Quality Factor

Many articles written on OEE (ours being the exception), indicate or suggest that the quality factor for OEE is calculated as a simple percentage of good parts from the total of all parts produced.  While this calculation may work for

Posted in Advanced Lean Manufacturing, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , ,

OEE Integration: Can you fix it?

As we are all aware, inspecting or measuring parts does not change the quality of the product.   Likewise, measuring and reporting OEE alone does not solve problems or improve performance.  While it is fair to say that increased focus and measurement

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2017
S M T W T F S
« Sep    
1234567
891011121314
15161718192021
22232425262728
293031  

Categories

Archives

Twitter

error: Content is protected !!