OEE in the Automotive Industry

The automotive industry appears to be rebounding at a faster rate than most (if not all) experts may have anticipated.  Many OEM’s and their suppliers are attempting to boost production to replenish inventories and support renewed demand for their products. 

Posted in OEE: Overall Equipment Efficiency Tagged with: , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE: Frequently Asked Questions

We added a new page to our site to address some of the more frequently asked questions (FAQ’s) we receive regarding OEE.  We trust you will find this information to be of interest as you move forward on your lean journey.  We always appreciate your

Posted in Advanced Lean Manufacturing, APQP, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Make or Break with OEE

Reward systems, bonuses, and other forms of compensation have been the topic of many newspaper articles and news broadcasts as of late.  Although attention has turned toward the viability and sustainability of the manufacturing sector, there are many of us who question how the performance

Posted in Advanced Lean Manufacturing, APQP, Capacity, Eliminate Waste, Lean, Lean Metrics, Problem Solving, Process Control and OEE Tagged with: , , , , , , ,

OEE – A Vantage Point Metric

The automotive industry has recently been plagued by doom and gloom as the economy continues to erode any chances for a rebound.  Chrysler has already met with the reality of an uncertain future and has subsequently filed for bankruptcy.  Unfortunately,

Posted in Advanced Lean Manufacturing, Lean Metrics, Problem Solving, Root Cause Analysis, Trouble Shooting Tagged with: , , , , , , ,

OEE Integration – Where do we Start?

Where do we Start? We mentioned in our previous post that OEE may be an initiative that your company chooses not to do. We doubt that too many corporations would support that view entirely, however, it may certainly influence how

Posted in Advanced Lean Manufacturing, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , ,

OEE Integration – Part V

Defining overall equipment effectiveness (OEE) criteria as part of the scope of work or purchase order agreement is quickly becoming standard practice throughout the automotive industry and manufacturing in general. OEE Assessments OEE criteria should be performed for every new purchase.  Often

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , ,

OEE and LEAN

Incorporating and tracking performance using Lean metrics doesn’t make a company Lean any more than tracking weight puts you on a diet.  Measurements are like decisions, nothing changes unless actions are taken. How does this apply to OEE?  How does OEE apply to

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , ,

OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes Definition:  Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single

Posted in Availability, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

October 2018
S M T W T F S
« Jul    
 123456
78910111213
14151617181920
21222324252627
28293031  

Categories

Archives

Twitter

error: Content is protected !!