Lean Execution > Quick Die Change
Blog Archives

Improving OEE: A Hands On Approach

We have explored Overall Equipment Efficiency (OEE) from several perspectives and how it can be used as an effective performance metric.  The purpose of measuring and monitoring OEE, at a minimum, should be three fold: To ensure the current performance levels are sustained,

Posted in Advanced Lean Manufacturing, Availability, Eliminate Waste, Lean Metrics, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , ,

OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question

Posted in Advanced Lean Manufacturing, Availability, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

November 2017
S M T W T F S
« Sep    
 1234
567891011
12131415161718
19202122232425
2627282930  

Categories

Archives

Twitter

error: Content is protected !!