Flawless Execution – “This Is It” – Practice Makes Perfect

We are often encouraged to look beyond our own business models to expand our horizons or to simply gain a different perspective.  Music is one of my personal areas of interest in the outside world and I have learned to

Posted in Advanced Lean Manufacturing, Availability, Collaboration, Eliminate Waste, Performance, Standardized Work, Training Tagged with: , , , , , , , , , ,

Software Modeling for Standardized Work

The concept of Standard Work is understood in virtually any work environment and is not exclusive to the lean enterprise.  Typically the greater challenge of standardized work is actually preparing an effective document that adequately describes the “work” to be

Posted in Advanced Lean Manufacturing, Lean Metrics, Problem Solving, Standardized Work Tagged with: , , , , , , , , , , , , , , , ,

Time Studies with your BlackBerry

Performing a time study is relatively easy compared to only few years ago.  The technologies available today allow studies to be conducted quite readily. Time Studies and OEE (Overall Equipment Effectiveness) The Performance factor for OEE is based on the Ideal Cycle Time of the

Posted in Advanced Lean Manufacturing, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , ,

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Benchmarking OEE

Benchmarking Systems: We have learned that an industry standard or definition for Overall Equipment Effectiveness (OEE) has been adopted by the Semi Conductor Industry and also confirms our approach to calculating and using OEE and other related metrics. The SEMI standards of interest are as

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE Where do we Measure – Part II

We have stated that policies and procedures will have an impact on your OEE implementation strategy.  One reader commented on Part I of this post stating that “OEE should be measured at the ‘design’ bottleneck process / piece of equipment that

Posted in Advanced Lean Manufacturing, APQP, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , ,

OEE Integration – Part V

Defining overall equipment effectiveness (OEE) criteria as part of the scope of work or purchase order agreement is quickly becoming standard practice throughout the automotive industry and manufacturing in general. OEE Assessments OEE criteria should be performed for every new purchase.  Often

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , ,

OEE Integration – Part IV

OEE and APQP – New Equipment / Program / Process Launch In parts I – III we discussed the role of leadership to define policies and procedures.  We also discussed developing the infrastructure of your team through training and development.  However, this

Posted in Advanced Lean Manufacturing, APQP, Capacity, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , ,

OEE and LEAN

Incorporating and tracking performance using Lean metrics doesn’t make a company Lean any more than tracking weight puts you on a diet.  Measurements are like decisions, nothing changes unless actions are taken. How does this apply to OEE?  How does OEE apply to

Posted in Advanced Lean Manufacturing, Eliminate Waste, Lean, Lean Metrics, Process Control and OEE Tagged with: , , , , , , , , , , , , ,

OEE and Morale

Is employee morale impacting your OEE?  If so, how much of a concern is it?  As we wrote in one of our recent posts,  “Perhaps the greatest “external” influence on current manufacturing operations is the rapid collapse of the automotive industry in the midst of our

Posted in Advanced Lean Manufacturing, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

August 2017
S M T W T F S
« Sep    
 12345
6789101112
13141516171819
20212223242526
2728293031  

Categories

Archives

error: Content is protected !!