Lean Execution > TEEP
Blog Archives

OEE: Planned Downtime and Availability

As a core metric, Overall Equipment Effectiveness or OEE has been adopted by many companies to improve operations and optimize the capacity of existing equipment.  Having completed several on site assessments over the past few months we have learned that

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, Execution Tagged with: , , , , , , , ,

Going DEEP with OEE

Does anyone actually look at their daily equipment availability? Instead of using TEEP that is typically based on calendarized availability, looking at the Daily Equipment Effectiveness Performance of your operation may provide some interesting insights. Working overtime due to material or equipment

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , ,

Availability and OEE

What is Availability? In its simplest form, availability measures the uptime of a machine or process against the planned production time.  As one of the factors of Overall Equipment Efficiency (OEE), Availability is expressed as a percentage.  The uptime is calculated

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE, Downtime, and TEEP

We have received several inquiries regarding equipment down time – periods of time when the machine is not scheduled to run.  We consider this to be scheduled down time or idle time and does not affect Overall Equipment Effectiveness (OEE),

Posted in Advanced Lean Manufacturing, Availability, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Training, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930
31  

Categories

Archives

Twitter

error: Content is protected !!