Lean Execution > Weighted OEE
Blog Archives

OEE For Manufacturing

We are often asked what companies (or types of companies) are using OEE as part of their daily operations.  While our focus has been primarily in the automotive industry, we are highly encouraged by the level of integration deployed in

Posted in Advanced Lean Manufacturing, Availability, Capacity, Cost Control, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Problem Solving, Quality Factor, Root Cause Analysis, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

OEE for Batch Processes

We recently received an e-mail regarding OEE calculations for batch processes and more specifically the effect on down stream equipment that is directly dependent (perhaps integrated) on the batch process.  While the inquiry was specifically related to the printing industry,

Posted in Advanced Lean Manufacturing, Availability, Capacity, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Lean Execution and OEE!

Welcome! If you are a first time visitor interested in getting started with Overall Equipment Effectiveness (OEE), click here to access our very first post “OEE – Overall Equipment Effectiveness“. We have presented many articles featuring OEE (Overall Equipment Effectiveness), Lean Thinking,

Posted in Advanced Lean Manufacturing, APQP, Availability, Capacity, Cost Control, Eliminate Waste, Execution, FREE Downloads, Lean, Lean Metrics, Lean Mindset, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Root Cause Analysis, Terminology, Training, Trouble Shooting, Uncategorized Tagged with: , , , , , , , , , , , , , , , , , ,

Cost Weighted OEE and other free OEE Spreadsheet Templates

OEE Spreadsheet Templates – One Click Closer: As the days of summer are upon us, we thought it would be good idea to make it easier for you to access our free downloads so you can spend more time doing

Posted in Advanced Lean Manufacturing, Cost Control, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , , , , , , , , , ,

OEE and the Quality Factor

Many articles written on OEE (ours being the exception), indicate or suggest that the quality factor for OEE is calculated as a simple percentage of good parts from the total of all parts produced.  While this calculation may work for

Posted in Advanced Lean Manufacturing, Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , ,

OEE Calculation Errors

Database Errors We agree that collecting and tracking OEE data is a task best suited for a database, however, all the bells and whistles of an OEE system don’t serve much purpose if the calculations are wrong.  Before you make

Posted in Lean Metrics, OEE: Overall Equipment Efficiency, Process Control and OEE Tagged with: , , , , , , , , , , ,

OEE For Dedicated – Single Part – Processes

OEE For Dedicated – Single Part – Processes Definition:  Dedicated – Single Part – Process:  A process that produces a single product or slight variations on a theme and does not require significant tooling or equipment changeover events. A single

Posted in Availability, Eliminate Waste, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality Tagged with: , , , , , , , , , , , , , , , , , , ,

OEE for Multiple Parts – Single Machine (Multipart Processes)

How to Calculate OEE for Single Machine and Multiple Parts. Flexible manufacturing provides the advantage of producing many different parts on the same piece of equipment.  The same is true for processes such as stamping presses, molding machines, or machining operations. The first question

Posted in Advanced Lean Manufacturing, Availability, FREE Downloads, Lean, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

How to Reduce Costs with OEE: Cost Control

OEE can be used to improved your bottom line. We provide a little insight to getting it right.

Posted in Advanced Lean Manufacturing, Availability, Cost Control, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Process Control and OEE, Quality, Risk Management, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Practical OEE – How To Calculate and Use Weighted OEE

We have presented the methods of calculating OEE for a process and also demonstrated how weighted OEE is calculated for multiple processes.  Our next challenge is to determine how this data can be used to make sure we are targeting the right

Posted in Advanced Lean Manufacturing, Availability, Capacity, Eliminate Waste, FREE Downloads, Lean, Lean Metrics, OEE: Overall Equipment Efficiency, Performance, Problem Solving, Process Control and OEE, Quality, Quality Factor, Training Tagged with: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Sign Up and JOIN our TEAM

Make it Yours

Namecheap

Free Downloads

December 2017
S M T W T F S
« Sep    
 12
3456789
10111213141516
17181920212223
24252627282930
31  

Categories

Archives

Twitter

error: Content is protected !!